Interconnection corridor


Jul/2012 – Approximately 45 km wide corridor, created in the high sea, from the region of Ilha Grande / Paraty, descending southwards, behind Ilhabela (SP) and involving the Alcatrazes Archipelago, Laje de Santos, Queimada Grande and in the sequence drifting to the coast and covering APA Litoral Sul, APA Ilha Comprida arriving until the channel of the Bay of Paranaguá (PR). The goal was to broaden the interregional connection to enhance the spawning process of spawning and the flow of coral recruits.